Likelihood
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Level of impact on the asset
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Risk Impact on Project (%)
|
0%
|
0%
|
0%
|
0%
|
0%
|
0%
|
0%
|
0%
|
0%
|
0%
|
0%
|
0%
|
0%
|
0%
|
Building Design/Construction Inputs
|
Physical Integrity
|
1. Provide the reason why this risk is not applicable to the project? (When the risk impact is equal to 0%)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2.1. Is there a local standard/code relevant to this risk?
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2.2. Provide name of the standard?
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2.3. Is there an international/bespoke standard that can be followed?
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2.4. Provide name of the standard?
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3.1. Is this risk mitigated at design?
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3.2. Is this risk mitigated at construction?
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3.3. Cost of mitigation ($)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3.4. Responsible party/ies (i.e. Structural Engineer)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3.5. Full name of responsible party?
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Operational Continuity
|
Heatwave mitigated? |
|
Notes
|
|
Green Building Certified? |
|
Notes
|
|
Back-up Power: Off-grid electric capacity (at least 24 hours energy storage) |
|
Notes
|
|
Back-up Power: Renewable energy onsite (at least 4 hour daily energy)
|
|
Notes
|
|
Back-up water capability 25% of building needs? |
|
Notes
|
|
Sewage backflow prevention? |
|
Notes
|
|
Multiple access entries to the site? |
|
Notes
|
|
Maintaining communications capability if cable line and cell fail? |
|
Notes
|
|
Additional notes on resilience not covered in above sections |
|
|